Dsj 4 1113 High Quality Jun 2026

admscope.com
Source
Policy Language
Search

This report evaluates the execution parameters required to achieve a (≥135m) on Hill 1113 (Planica HS139). The analysis focuses on in-run posture, takeoff timing, flight phase stability, and landing technique. The hill is characterized by its steep landing zone and sensitive wind compensation model.

100%

Dsj 4 1113 High Quality Jun 2026

This report evaluates the execution parameters required to achieve a (≥135m) on Hill 1113 (Planica HS139). The analysis focuses on in-run posture, takeoff timing, flight phase stability, and landing technique. The hill is characterized by its steep landing zone and sensitive wind compensation model.